Log inGroundwater contamination, consisting of two dissolved-phase plumes originating from chlorinated solvent source areas, in the southeastern portion of the Young- Rainey Star Center (aka the Pinellas County, Florida, Site) in Largo, Florida, has migrated beyond the property boundary, beneath the roadways, and beneath adjacent properties to the south and east. Groundwater contamination will persist as long as the onsite contaminant source remains. The origin of the contamination appears to be multiple long-term point sources beneath Building100, a 4.5 ha (11 acre) building that housed manufacturing facilities during US DOE operations at the site. span style='font-family: "Verdana","sans-serif";'>span style='font-family: "Verdana","sans-serif";'>The site is now owned by Pinellas County, and most of the space inside the building is leased to private companies, so DOE chose not to conduct characterization or remediation through the floor of the building, instead choosing to conduct all work from outside the building. Injection of emulsified soybean oil and a microbial culture has been used at other areas of the site to accelerate naturally occurring bacterial processes that degrade groundwater contaminants to harmless compounds, and that same approach was chosen for this task. span style='font-family: "Verdana","sans-serif";'> span style='line-height: 115%; font-family: "Verdana","sans-serif"; font-size: 11pt; mso-fareast-font-family: "Times New Roman"; mso-fareast-theme-font: minor-fareast; mso-bidi-font-family: "Times New Roman"; mso-ansi-language: EN-US; mso-fareast-language: EN-US; mso-bidi-language: AR-SA;'>We describe the details of designing and constructing horizontal injection wells for bioremediation beneath a large, occupied industrial production facility, including lessons learned; technical, logistical, and environmental challenges; community relations; and regulatory relations. Because of the expected lag in biological acclimation and response, distance between the treatment areas and associated monitoring points, and low groundwater velocity, it will likely be years before full impacts of the project will be realized."> Groundwater contamination, consisting of two dissolved-phase plumes originating from chlorinated solvent source areas, in the southeastern portion of the Young- Rainey Star Center (aka the Pinellas County, Florida, Site) in Largo, Florida, has migrated beyond the property boundary, beneath the roadways, and beneath adjacent properties to the south and east. Groundwater contamination will persist as long as the onsite contaminant source remains. The origin of the contamination appears to be multiple long-term point sources beneath Building100, a 4.5 ha (11 acre) building that housed manufacturing facilities during US DOE operations at the site. span style='font-family: "Verdana","sans-serif";'>span style='font-family: "Verdana","sans-serif";'>The site is now owned by Pinellas County, and most of the space inside the building is leased to private companies, so DOE chose not to conduct characterization or remediation through the floor of the building, instead choosing to conduct all work from outside the building. Injection of emulsified soybean oil and a microbial culture has been used at other areas of the site to accelerate naturally occurring bacterial processes that degrade groundwater contaminants to harmless compounds, and that same approach was chosen for this task. span style='font-family: "Verdana","sans-serif";'> span style='line-height: 115%; font-family: "Verdana","sans-serif"; font-size: 11pt; mso-fareast-font-family: "Times New Roman"; mso-fareast-theme-font: minor-fareast; mso-bidi-font-family: "Times New Roman"; mso-ansi-language: EN-US; mso-fareast-language: EN-US; mso-bidi-language: AR-SA;'>We describe the details of designing and constructing horizontal injection wells for bioremediation beneath a large, occupied industrial production facility, including lessons learned; technical, logistical, and environmental challenges; community relations; and regulatory relations. Because of the expected lag in biological acclimation and response, distance between the treatment areas and associated monitoring points, and low groundwater velocity, it will likely be years before full impacts of the project will be realized.">