Melissa Lutz

Melissa Lutz

7 articles
USA US DOE LM

Track

Track 7 - Environmental Remediation Track 7 - Environmental Remediation (ER) Track 8 - Communications, Education and Training

Biography

Melissa Lutz joined the U.S. DOE Office of Legacy Management (LM) in July 2021. Melissa is the site manager for the RCRA Pinellas Site and well as a number of D&D and FUSRAP sites. Melissa started her environmental career as a DOE contractor at the Weldon Spring Site in 1990 supporting site remediation and site transition into long-term surveillance and maintenance. In 2003, Melissa transitioned as a contractor to LM where her responsibilities included Weldon Spring site operations manager and later the Mound site lead until joining LM in 2021. Melissa graduated from the University of Illinois.

Showing 7 of 7
Positive Impacts from Decades of Consistent Communication at Former DOE Pinellas Plant
Melissa Lutz US DOE LM
Julian Caballero RSI, Contractor to DOE LM
Track 1 - Crosscutting Policies and Programs Full Oral Session Paper Attachment
137: Long-Term Stewardship/Legacy Management: Collaborations, Contaminants, and Climate (7.05a)
WM2024
Best Practices in Transition from Cleanup to Long-term Stewardship at Sites
Tiffany Drake US DOE LM
Melissa Lutz US DOE LM
Charlee Boger US DOE LM
Nicole Keller US DOE LM
+2 more
Track 9 - Special Topics and Multi-Track Cross Cutting Technology Full Oral Session Paper Attachment
172: Long-Term Stewardship/Legacy Management: Cover Performance to Continuous Improvement (7.05b)
WM2024
Use of 811 Call Before You Dig State Programs Serves as an Additional Layer of Site Protections
Tiffany Drake US DOE LM
Melissa Lutz US DOE LM
Greg Lupton RSI
Julian Caballero RSI, Contractor to DOE LM
Track 2 - High-Level Radioactive Wastes (HLW), Spent Nuclear Fuel/Used Nuclear Fuel (SNF/UNF) and Long-Lived Alpha/Transuranic Radioactive Waste (TRU) Full Oral Session Paper Attachment
109: ER Post Closure Challenges and Long-Term Stewardship/Legacy Management (7.5)
WM2023
Evolution of Stakeholder Relations at the Mound Laboratory – End of DOE’s Mission to the Present
Susan Smiley US DOE Office of LM
Melissa Lutz US DOE LM
Track 1 - Crosscutting Policies and Programs Full Oral Session Paper
106: Communication of Technical Issues: Worldwide Experiences
WM2019
Preserving the Mound Laboratory Legacy—The Mound Cold War Discovery Center
Susan Smiley US DOE Office of LM
Melissa Lutz US DOE LM
Track 1 - Crosscutting Policies and Programs 1/2 Panel Session Paper
004B: Panel: Best Practices in Project Communication Involving Stakeholders
WM2019
Collaborative Initiatives for Improving the Formerly Utilized Sites Remedial Action Program 
Ken Kreie US DOE LM
Nicki Fatherly HQ-USACE
George Bock USACE-HQ
Melissa Lutz US DOE LM
+1 more
Track 7 - Environmental Remediation 1/2 Oral Session Attachment
079: Formerly Utilized Sites Remedial Action Program (FUSRAP) and US Army Corps of Engineers Projects (7.06a)
WM2025
Site Transitions Moving From Cleanup to Long-Term Stewardship
Melissa Lutz US DOE LM
Jane Powell US DOE
Track 6 - Decontamination & Decommissioning Oral Paper
042 - ER Post Closure Challenges and Long Term Stewardship/Legacy Management
WM2014