Brandon Jones

Brandon Jones

2 articles
USA SIMCO

Track

Track 2 - High-Level Radioactive Wastes (HLW), Spent/Used Nuclear Fuel (SNF/UNF) and Long-lived Alpha/Transuranic Radioactive Waste (TRU)

Biography

Brandon Jones is the Capital Asset Project Manager for the Waste Isolation Pilot Project. Brandon has a successful history of building high performance teams and a excellent safety, quality, cost, and schedule performance and providing day-to-day, hands-on management style. His construction project management experience includes labor relations, engineering, field craft management, subcontract management, waste management of fly ash pond closures, and commissioning start up on major nuclear power and commercial projects. His collaborative/decisive leadership style has provided successful and effective construction management, construction planning, work execution program leadership throughout his 20 + year professional career.

Showing 2 of 2
Capital Assets
Brandon Jones SIMCO
Track 1 - Crosscutting Policies and Programs 1/2 Panel Session Attachment
024: Panel: Progress on the US DOE Waste Isolation Pilot Plant (WIPP)(1/4)(R2.05a)
WM2024
WIPP Capital Asset
Brandon Jones SIMCO
Track 3 - Low-Level Waste (LLW), Intermediate Level Waste (ILW), Very Low-Level Waste (VLLW), Mixed Waste (MW), By Product Material, TENORM, NORM Residues, Enriched and Depleted Uranium (DU) 1/2 Panel Session Attachment
024: Panel: Update on the US Waste Isolation Pilot Plant (WIPP) (1/2)(R2.05a)
WM2025